You are here:​
/
Laboratories STI

Testing rig for thermal and hybrid chillers/heat pumps

The testing rig for thermal and hybrid chillers/heat pump is located in CENTROPROVE and was designed to supply the power and temperature levels needed for the operation of thermally-operated systems. The main components in the testing rig are the hot storage tank, with a volume of 1.5 m3 (1) and...

Testing rig for thermal energy storages

  The testing rig available at CNR ITAE allows testing thermal energy storages employing PCM or hybrid latent/sensible technology. The thermal energy is provided by a 24 kW electric boiler, connected to a buffer storage to guarantee a quasi-constant inlet to the storage under testing. The charge is accomplished by...

Materials for Thermal Energy Systems

The activity of the laboratory is based on the synthesis and characterization of adsorbent materials and phase change materials for thermal energy storage. The synthetized materials consist in composite adsorption materials, called selective water sorbent, “SWS materials”. The SWS material is a two phase system which consist of a porous...